Acceleration of permit-granting for defence readiness projects (Omnibus V)

2025/0172(COD)·10th term·ENVI / IMCO / SEDE·COD - Ordinary legislative procedure (ex-codecision procedure)·In progressAwaiting Parliament's position in 1st reading
Rapporteur (the Member appointed to lead Parliament's work on this text): YAR Lucia (Renew)
Summary

This dossier concerns the acceleration of permit-granting for defence readiness projects (Omnibus V). The amendments range from rejecting the Commission proposal to setting fast-track national permitting procedures while maintaining compliance with Union environmental law on water, waste, air, habitats and biodiversity; they address unmanned aircraft systems bases in island and border areas, European SMEs, energy access, restrictions on lead in munitions, and carbon emissions in the defence sector.

Procedure timeline

  1. Committee amendments tabled
    13 Oct 2025 – 28 Oct 2025
  2. Plenary vote — Rejected
    16 Sep 2026 · On a motion to reject the proposal · amendment 64
  3. Plenary vote — Adopted
    16 Sep 2026 · On the provisional agreement negotiated with the Council (the trilogue deal) · amendment 65
  4. In progress — not yet concluded
357
Amendments
distinct, in window
64
Members
tabled at least one
3
Committees
13 Oct 2025 – 28 Oct 2025
Dates

Plenary votes

2 roll-call votes

In plenary, Parliament usually votes in steps: first on amendments to the text (sometimes split into parts, so Members can accept one half of a sentence and reject the other), then on the text as a whole. The “main vote” is the one that adopts or rejects the text itself. Each vote below shows exactly which step it was. How voting works →

Where each group stood at the decisive votes

GroupShift
EPPFor100%For100%consistent
S&DFor95%For98%consistent
RenewFor97%For99%consistent
Greens/EFAFor68%For78%consistent
ECRFor94%For93%consistent
The LeftAgainst88%Against90%consistent
PatriotsFor79%For80%consistent
ESNAgainst92%Against88%consistent
Non-attachedAgainst67%Against67%consistent

Milestones are the votes that adopt or reject text (not every amendment vote) — the percentage is the share of the group’s Members behind that position. Positions are shown on the text itself: on a rejection motion, a vote for rejection counts as against the text. Click a column heading to open the vote below.

  1. 16 Sep 2026Main voteAdopted
    On the provisional agreement negotiated with the Council (the trilogue deal) · amendment 65
    Official label: Accord provisoire - Am 65 · what was voted ↗
    540 for105 against22 abstentions50 did not vote
    For
    Against
    Abst.

    Click a group to see each Member’s position.

  2. 16 Sep 2026Main voteRejected
    On a motion to reject the proposal · amendment 64
    Official label: Proposition de rejet - Am 64 · what was voted ↗
    95 for546 against22 abstentions54 did not vote
    For
    Against
    Abst.

    Click a group to see each Member’s position.

Vote data: HowTheyVote.eu (ODbL, attribution) / European Parliament · roll-call votes only

Plenary amendments65 tabled on this text

Amendments tabled for the plenary sitting on this text, in their own numbering series. This is a different set from the committee amendments tracked elsewhere on AmendEU, and is not counted in any of the site’s amendment totals.

  1. Amendment 1Proposal for a regulation · Recital 1
    Current text

    (1) The Union is facing an acute and growing threat, as underscored in the Joint White Paper on European Defence Readiness 20302 , linked to the return of full-scale conflict in Europe. In response to this escalating challenge, it is imperative that the Union takes decisive action to bolster its defence readiness. There is urgency to ramp up European defence readiness to ensure that Europe has a strong and sufficient European defence posture by 2030 at the latest. Based on projections of gradual take-up of the instruments proposed under the ReArm Europe Plan/Readiness 2030, defence investment could reach at least EUR 800bn over the next four years. A crucial aspect of this effort is the need…

    Amendment

    (1) The Union is facing an acute and growing threat, as underscored in the Joint White Paper on European Defence Readiness 20302, linked to the return of full-scale conflict in Europe in the context of Russia’s war of aggression against Ukraine and the associated hybrid activities targeting the Union and its Member States, including sabotage, cyberattacks, disinformation, economic coercion and hostile intelligence operations, as well as repeated violations of EU and NATO airspace, and also an evolving transatlantic security posture. Accordingly, the Union must reinforce its strategic autonomy and resilience. In response to this escalating challenge, it is imperative that the Union takes deci…

    Excerpt — full text in the official PDF.
  2. Amendment 2Proposal for a regulation · Recital 1 a (new)
    Amendment

    (1a) Based on projections of gradual take-up of the instruments proposed under the ReArm Europe Plan/Readiness 2030, defence investment could reach at least EUR 800bn over the next four years. Such a level of investment also provides an opportunity to develop the European Defence Technological and Industrial Base (EDTIB) within the single market, by enabling competitive, innovative and diverse defence technology actors to participate effectively in the EDTIB, while ensuring fair participation in the defence market, including SMEs, and in full compliance with Union and national social, labour, safety and environmental standards. A crucial aspect of this effort is the need to ramp up the Union…

    Excerpt — full text in the official PDF.
  3. Amendment 3Proposal for a regulation · Recital 2
    Current text

    (2) In this context, defence readiness should be understood as the ability of Member States to anticipate, prevent, and respond to defence related crises, as referred to in Directive 2009/81/EC of the European Parliament and of the Council3 through a proactive and coordinated approach. This includes ensuring the availability of defence industrial capacity required to acquire and maintain the necessary resources, capabilities, and infrastructure with the aim of responding effectively to such crises. __________________ 3 Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of procedures for the award of certain works contracts, supply contracts…

    Amendment

    (2) In this context, defence readiness should be understood as the ability of Member States to anticipate, prevent, and respond to defence related crises, as referred to in Directive 2009/81/EC of the European Parliament and of the Council3 through a proactive and coordinated approach. This includes ensuring the availability of defence industrial capacity required to acquire and maintain the necessary resources, capabilities, and infrastructure with the aim of responding effectively to such crises. Furthermore, defence readiness should also include broader preparedness, strengthening the resilience of society as a whole, to hybrid threats, disinformation campaigns, cyber attacks and other no…

    Excerpt — full text in the official PDF.
  4. Amendment 4Proposal for a regulation · Recital 3
    Current text

    (3) Setting up or extending facilities, infrastructure and undertaking activities related to defence readiness often requires applying for several relevant permits and approvals. Existing permitting processes for assessments across various areas are often lengthy and cumbersome. Those procedures currently lack Union-wide provisions for fast-track processes specific to defence readiness activities, which impedes the ramp-up of defence production and related infrastructure in a timely manner and defence readiness activities and investments that are crucial for meeting emerging security demands.

    Amendment

    (3) Setting up or extending facilities, infrastructure and undertaking activities related to defence readiness often requires applying for several relevant permits and approvals. Existing permitting processes for assessments across various areas are often lengthy and cumbersome. Small mid-caps and SMEs in particular are disproportionately affected, which has negative consequences for the entire supply chain. Those procedures currently lack Union-wide provisions for fast-track processes specific to defence readiness activities, which impedes the ramp-up of defence production and related infrastructure in a timely manner and defence readiness activities and investments that are crucial for mee…

    Excerpt — full text in the official PDF.
  5. Amendment 5Proposal for a regulation · Recital 4
    Current text

    (4) The national permit-granting process ensures that defence readiness projects are safe, secure and comply with environmental, social and other safety requirements. Union environmental law sets common conditions for the content of the national permit-granting process, thereby ensuring a high level of environmental protection and allowing for the sustainable exploitation of the Union’s potential along the raw materials value chain.

    Amendment

    (4) The national permit-granting process ensures that defence readiness projects are carried out safely, securely and in full compliance with relevant environmental, social, labour and other safety requirements throughout all stages of the process. Union environmental law sets common conditions for the content of the national permit-granting process, thereby ensuring a high level of environmental protection. In light of the acute threat posed by Russia’s war of aggression against Ukraine and the accompanying hybrid activities directed against the Union and its Member States, it is essential that the application of Union and national rules enables the rapid and efficient implementation of def…

    Excerpt — full text in the official PDF.
  6. Amendment 6Proposal for a regulation · Recital 5
    Current text

    (5) At the same time, the unpredictability, complexity and, often, excessive length of national permit-granting processes undermine the investment security needed for the effective strengthening of Member States defence readiness. The structure and length of a permit-granting process for relevant projects can also differ greatly between Member States. Therefore, to ensure and speed up their effective implementation, Member States should apply streamlined and predictable permit-granting processes to defence readiness projects.

    Amendment

    (5) The unpredictability, complexity and, often, excessive length of national permit-granting procedures undermine investment security, certainty and planning needed for the effective strengthening of Member States defence readiness and risk discouraging innovative SMEs and small mid-caps from entering into or scaling within the defence sector. The structure and length of a permit-granting process for relevant projects can also differ greatly between Member States. Therefore, to ensure and speed up their effective implementation, Member States should apply streamlined and predictable permit-granting processes to defence readiness projects.

  7. Amendment 7Proposal for a regulation · Recital 5 a (new)
    Amendment

    (5a) Defence readiness projects, including related industrial and governmental activities can, where applicable, fall within the scope of existing Union provisions allowing derogations, including from Union environmental law, on grounds of “overriding public interest”, “public safety” or “crisis” response. Member States can therefore, where so provided under national law, assess on a case-by-case basis whether permit-granting procedures for defence readiness projects can rely on those existing derogations. Any such assessment should be carried out in accordance with the conditions set out in the relevant Union and national law. Where compensatory or mitigating measures are required in the fr…

    Excerpt — full text in the official PDF.
  8. Amendment 8Proposal for a regulation · Recital 6
    Current text

    (6) While certain Member States have taken or are likely to take measures to accelerate the permission-granting processes for the defence industry, this may be done in diverging ways which would result in barriers to the functioning of the internal market in the defence sector. Divergent national legislation, regarding the planning permit-granting process of defence projects have proven to become bottlenecks for European relevant defence products supply chains. To ensure the functioning of the internal market, it is necessary to establish harmonised rules for the acceleration of the permit-granting processes.

    Amendment

    (6) While certain Member States have taken or are likely to take measures to accelerate the permission-granting processes for the defence industry, this may be done in diverging ways which would result in barriers to the functioning of the internal market in the defence sector. Divergent national legislation, regarding the planning permit-granting process of defence projects have proven to become bottlenecks for European relevant defence products supply chains. To ensure the functioning of the internal market, it is necessary to establish harmonised rules and timelines for the acceleration of the permit-granting processes.

  9. Amendment 9Proposal for a regulation · Recital 7 a (new)
    Amendment

    (7 a) The application of this Regulation should fully respect the sole responsibility of the Member States for safeguarding their national security. Essential functions, including the defence of the territory, the maintenance of law and order and the protection of public security, remain within national competence and are not affected by this Regulation. Member States can maintain or introduce extraordinary national permitting procedures, provided that such measures do not undermine the functioning of the internal market for defence readiness projects within the scope of this Regulation.

  10. Amendment 10Proposal for a regulation · Recital 8
    Current text

    (8) There is a pressing need to reduce the complexity and duration of permitting processes for defence readiness projects. By establishing national permitting frameworks that prioritise these projects and ensure their rapid processing, the Union aims to enhance its defence production capacity and readiness by 2030 at the latest.

    Amendment

    (8) There is a pressing need to reduce the complexity and duration of permitting processes for defence readiness projects, while ensuring that such processes are accessible to mid-caps, small mid-caps and SMEs contributing to the development of new and emerging defence technologies. By establishing national permitting frameworks that prioritise these projects and ensure their rapid processing, the Union aims to enhance its defence production capacity and readiness by 2030 at the latest.

  11. Amendment 11Proposal for a regulation · Recital 8 a (new)
    Amendment

    (8a) In situations of supply chain crisis, uncertainty can hinder timely decisions and investment planning. Member States are therefore encouraged to publish and periodically update clear, accessible online information on relevant risks and bottlenecks, in line with national security and confidentiality requirements, in order to help companies anticipate and adjust their production, support the efficient allocation of scarce resources to strategically important projects and strengthen the Union’s defence industrial resilience and strategic autonomy.

  12. Amendment 12Proposal for a regulation · Recital 9
    Current text

    (9) In order to address these challenges, the defence industry should benefit of rules proven to be effective in streamlining industrial permitting processes. Aiming to reduce permitting deadlines for defence industry activities, including construction of new plants and related infrastructure, expansion of existing facilities, establishment of testing sites, training and certifying while also building on and broadening existing applicable provisions.

    Amendment

    (9) In order to address these challenges, the defence industry should benefit of rules proven to be effective in streamlining industrial permitting processes and boosting innovative defence industrial actors. Aiming to reduce permitting deadlines for defence industry activities, including construction of new plants and related infrastructure, expansion of existing facilities, establishment of testing sites, training, certifying, and research and development, including prototype construction and technology transfer, while also building on and broadening existing applicable provisions. A more agile regulatory framework will free up resources for technological innovation, encourage production m…

    Excerpt — full text in the official PDF.
  13. Amendment 13Proposal for a regulation · Recital 9 a (new)
    Amendment

    (9a) To ensure that a streamlined permitting process and prioritisation processes cover the whole defence value chain, the concept of the defence industry should include not only undertakings manufacturing defence-related products within the meaning of Directive 2009/43/EC, but also undertakings providing services that directly enhance the defence readiness of one or more Member States. Furthermore, to address the principal bottlenecks in defence investments, the permit-granting process under this Regulation should cover all relevant permissions, including permits, approvals or licences required to build, expand, convert, operate or repurpose installations, equipment or activities for the ma…

    Excerpt — full text in the official PDF.
  14. Amendment 14Proposal for a regulation · Recital 10 a (new)
    Amendment

    (10a) Member States should ensure that permitting and assessment procedures required under national law are organised in a coordinated manner that complements those required under Union law, avoiding overlap, duplication and unnecessary administrative delays, while maintaining a high level of environmental protection. Where appropriate, such procedures should be coordinated or combined to provide an efficient, predictable and transparent process for project promoters.

  15. Amendment 15Proposal for a regulation · Recital 10 b (new)
    Amendment

    (10b) To safeguard trust in the simplification of administrative processes, accelerated procedures and the internal market, Member States should ensure the impartiality of single points of contact and all competent national authorities involved in the permit-granting process, including through maintaining fair-competition and conflict-of-interest principles, transparency of decision-making, publication of non-confidential statistics on permit decisions. Those measures should ensure non-discriminatory access for SMEs and companies of all sizes across the Union. Member States and the Commission should ensure that appropriate measures are in place to prevent, detect, and correct any risk of fra…

    Excerpt — full text in the official PDF.
  16. Amendment 16Proposal for a regulation · Recital 10 c (new)
    Amendment

    (10c) This Regulation clarifies that, when a project is subject to an environmental impact assessment pursuant to Directive 2011/92/EU, the steps (i) and (ii) of the environmental impact assessment timeline should not be included in the duration of the permit-granting process established by this Regulation. This Regulation also requires single points of contact to provide information to project promoters about the requirement to carry out an environmental impact assessment, as well as the scope and level of detail of such assessment.

  17. Amendment 17Proposal for a regulation · Recital 11
    Current text

    (11) To facilitate the efficient and timely processing of administrative permitting applications related to defence readiness activities and the scaling up of defence production, Member States need to ensure that the competent national authorities implement fast-track procedures. Those authorities should provide the most rapid legal treatment possible for such applications, thereby enabling timely responses to defence readiness needs.

    Amendment

    (11) To facilitate the efficient and timely processing of administrative permitting applications related to defence readiness activities and the scaling up of defence production, and supporting mid-caps, small mid-caps and SMEs, Member States need to ensure that the competent national authorities implement fast-track procedures. Those authorities should provide the most rapid legal treatment possible for such applications, thereby enabling timely responses to defence readiness needs. The competent authorities have flexibility to prolong the standard fast-track timeline for the reasons of potential risks to health, safety, the environment, and national security. To ensure that these exception…

    Excerpt — full text in the official PDF.
  18. Amendment 18Proposal for a regulation · Recital 11 a (new)
    Amendment

    (11a) In addition, in order to further accelerate and streamline the permit issuing process, the principle of tacit approval should apply to the application for a permit except where that principle is in contradiction with the existing national legal system of a Member State. Therefore, an application for a permit should be considered granted if the project promoter has not been informed by the single point of contact within the applicable deadline of the outcome of the permit-granting process.

  19. Amendment 19Proposal for a regulation · Recital 11 b (new)
    Amendment

    (11b) Where a permit for a defence readiness project is implicitly granted, such approval should not exempt the project promoter or the competent authority from full compliance with applicable Union and national law, including provisions on environmental protection and on the health and safety of workers.

  20. Amendment 20Proposal for a regulation · Recital 12
    Current text

    (12) Establishing a single point of contact for industry applications regarding permits related to defence activities is intended to streamline communication, reduce administrative burdens and further expedite the permitting process with clear and legally binding deadlines, thereby providing efficient pathway for defence-related industrial applications. Moreover, it will provide certainty to investors by ensuring the rapid treatment of permit applications and limiting the risks to investments related to lengthy procedures.

    Amendment

    (12) Establishing one or more single points of contact for industry applications regarding permits related to defence activities. is intended to streamline communication, clarify responsibilities, reduce administrative burdens and further expedite the permitting process with clear and legally binding deadlines, thereby providing efficient pathway for defence-related industrial applications. Moreover, it will provide certainty to investors by ensuring the rapid treatment of permit applications and limiting the risks to investments related to lengthy procedures. Member States should provide their single points of contact, as well as any authority involved in the permit-granting process, with s…

    Excerpt — full text in the official PDF.
  21. Amendment 21Proposal for a regulation · Recital 12 a (new)
    Amendment

    (12a) In Member States with a federal or otherwise decentralised administrative structure, or where regional or local authorities are required to be involved in the approval process or to adopt the relevant decisions, the functions of the single point of contact may be exercised through a coordinating structure involving regional or local authorities, provided that it is ensured that project promoters have one clearly identified interface for each project, and that that interface is coordinated and streamlined. Member States should make best efforts to ensure that project promoters, in particular SMEs and small mid-caps, can easily identify and access the competent single point of contact fo…

    Excerpt — full text in the official PDF.
  22. Amendment 22Proposal for a regulation · Recital 14
    Current text

    (14) Furthermore, Member States should provide the necessary administrative support to defence readiness projects located on their territory, to facilitate their timely and effective implementation, paying particular attention to the needs of small and medium-sized enterprises and mid-cap enterprises involved in those projects, by providing assistance regarding compliance with applicable administrative and reporting obligations, informing the public to increase acceptance of the projects and guiding project promoters through the permit-granting process.

    Amendment

    (14) Furthermore, Member States should provide the necessary administrative support to defence readiness projects located on their territory, to facilitate their timely and effective implementation, paying particular attention to the needs of small and medium-sized enterprises which often face higher relative compliance costs and limited administrative capacity. To that end, the single point of contact should include dedicated support functions for SMEs and midcaps, such as helpdesks, harmonised templates and digital tools, offering clear guidance on documentation and compliance requirements and assistance throughout the permit-granting process, so that smaller actors can participate effecti…

    Excerpt — full text in the official PDF.
  23. Amendment 23Proposal for a regulation · Recital 14 a (new)
    Amendment

    (14a) To ensure effective, transparent and comparable implementation, the performance of single points of contact should be assessed through common Union-wide indicators and data collected to be submitted by each Member State to the Commission annually.

  24. Amendment 24Proposal for a regulation · Recital 14 b (new)
    Amendment

    (14b) Transparency and equal access to information are crucial for the effective implementation of permit-granting processes. Member States should ensure that all project promoters, regardless of their Member State of establishment, have support and equal access to centralised, easily accessible online information. This includes details on single points of contact, permit-granting procedures, dispute resolution mechanisms, financing and investment services, and available Union or national funding instruments.

  25. Amendment 25Proposal for a regulation · Recital 14 c (new)
    Amendment

    (14c) To avoid the proliferation of uncoordinated administrative platforms, Member States should design digital tools supporting this Regulation that are interoperable in order to allow for reusing information already submitted under other Union or national procedures and offer a single, user-friendly digital interface, particularly benefiting SMEs and mid-caps.

  26. Amendment 26Proposal for a regulation · Recital 15
    Current text

    (15) The Commission may offer capacity-building support to the single point of contact, including technical assistance, training, monitoring and evaluation, with the aim of developing and strengthening the abilities, processes and resources that the single points of contacts need to develop for the purposes of this Regulation. Such support may be requested by Member States and will fall within the scope of supporting actions under the European Defence Industry Programme [reference to be added once EDIP is adopted].

    Amendment

    (15) The Commission should, upon request by a Member State offer capacity-building support to the single point of contact, including technical assistance, training, monitoring and evaluation, with the aim of developing and strengthening the abilities, processes and resources that the single points of contacts need to develop for the purposes of this Regulation. Such support may be requested by Member States and will fall within the scope of supporting actions under Regulation (EU) 20XX/XXXX on the European Defence Industry Programme [reference to be added once EDIP is adopted].

  27. Amendment 27Proposal for a regulation · Recital 17
    Current text

    (17) In order to provide project promoters and other investors with the security and clarity needed to increase development of defence readiness projects, Member States should ensure that the permit-granting process related to such projects does not exceed set time limits.

    Amendment

    (17) In order to provide project promoters and other investors with the security and clarity needed to increase development of defence readiness projects, Member States should ensure that the permit-granting process related to such projects does not exceed set time limits. Completion within those time limits should take the form of a reasoned, written decision, whether granting or refusing the relevant permit, - notified by the single point of contact to the project promoter.

  28. Amendment 28Proposal for a regulation · Article 1 – paragraph 1 – point 1
    Current text

    (1) ‘defence readiness project’ means set of activities, investments and measures aimed at enhancing the defence readiness of a Member State or several Member States, including through the development of the defence industry;

    Amendment

    (1) ‘defence readiness project’ means set of activities, investments and measures or measures primarily intended to enhance the defence readiness of a Member State or several Member States jointly, including through the development or modernisation of the defence industry;

  29. Amendment 29Proposal for a regulation · Article 1 – paragraph 1 – point 2
    Current text

    (2) ‘defence industry’ means all undertakings engaged in the development, production, and manufacture of defence-related products as defined in Article 3(1) of Directive 2009/43/EC of the European Parliament and of the Council6 ; __________________ 6 Directive 2009/43/EC of the European Parliament and of the Council of 6 May 2009 simplifying terms and conditions of transfers of defence-related products within the Community (OJ L 146, 10.6.2009, p. 1, ELI: http://data.europa.eu/eli/dir/2009/43/oj).

    Amendment

    (2) ‘defence industry’ means all undertakings engaged in the development, production, and manufacture or supply of defence-related products as defined in Article 3(1) of Directive 2009/43/EC of the European Parliament and of the Council 6 or in the provision of services that enhance the defence readiness of one or several Member States; __________________ 6 Directive 2009/43/EC of the European Parliament and of the Council of 6 May 2009 simplifying terms and conditions of transfers of defence-related products within the Community (OJ L 146, 10.6.2009, p. 1, ELI: http://data.europa.eu/eli/dir/2009/43/oj).

  30. Amendment 30Proposal for a regulation · Article 1 – paragraph 1 – point 3
    Current text

    (3) ‘defence readiness’ means the state of preparedness of a Member State or several Member States to respond to a crisis defined in Article 1, point (10) of Directive 2009/81/EC of the European Parliament and of the Council7 , which relates to defence; __________________ 7 Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of procedures for the award of certain works contracts, supply contracts and service contracts by contracting authorities or entities in the fields of defence and security, and amending Directives 2004/17/EC and 2004/18/EC (OJ L 216, 20.8.2009, p. 76, ELI: http://data.europa.eu/eli/dir/2009/81/oj).

    Amendment

    (3) ‘defence readiness’ means the state of preparedness of a Member State or several Member States to anticipate, prevent or respond to a crisis as defined in Article 1, point (10) of Directive 2009/81/EC of the European Parliament and of the Council 7 , which relates to defence; __________________ 7 Directive 2009/81/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of procedures for the award of certain works contracts, supply contracts and service contracts by contracting authorities or entities in the fields of defence and security, and amending Directives 2004/17/EC and 2004/18/EC (OJ L 216, 20.8.2009, p. 76, ELI: http://data.europa.eu/eli/dir/2009/81/…

    Excerpt — full text in the official PDF.
  31. Amendment 31Proposal for a regulation · Article 1 – paragraph 1 – point 6
    Current text

    (6) ‘permit-granting process’ means a process that covers all relevant permits, including permits necessary to build, expand, convert and operate defence readiness projects and all the necessary administrative steps from the acknowledgement that the application is complete to the notification of the final decision on that application by the single contact point concerned;

    Amendment

    (6) permit-granting process’ means a process that covers all relevant permissions permits, including permits, approvals or licences necessary to build, expand, convert and operate or repurpose any installation, equipment or activity for manufacturing defence products or components or for other activities forming part of a defence readiness project together with all administrative steps from acknowledgement of application completeness to notification of the final decision by the single point of contact;

  32. Amendment 32Proposal for a regulation · Article 2 – title
    Current text

    Single point of contact

    Amendment

    Single points of contact

  33. Amendment 33Proposal for a regulation · Article 2 – paragraph 1
    Current text

    1. By …[3 months after the date of entry into force of this Regulation], each Member State shall establish or designate one authority as single point of contact at the relevant administrative level.

    Amendment

    1. By …[3 months after the date of entry into force of this Regulation], each Member State shall establish or designate one authority as single point of contact at the relevant administrative level. The single point of contact shall operate as a single interface for each defence readiness project.

  34. Amendment 34Proposal for a regulation · Article 2 – paragraph 2
    Current text

    2. The single point of contact shall be responsible for facilitating and coordinating the permit-granting process for defence readiness projects and for providing information on streamlining the administrative processes in accordance with Article 3, including information to the project promoter on when an application is considered to be completed in accordance with Article 5(6).

    Amendment

    2. The single point of contact shall be responsible for facilitating and coordinating the permit-granting process for defence readiness projects and for providing information on streamlining the administrative processes in accordance with Article 3, including information to the project promoter on when an application is considered to be completed in accordance with Article 5(6). At the request of the project promoter, the single point of contact shall also provide information whether the project could be considered a defence readiness project under this Regulation, as well as information on the required documentation to be submitted as part of the final application.

  35. Amendment 35Proposal for a regulation · Article 2 – paragraph 4
    Current text

    4. Project promoters shall be allowed to submit any documents relevant to the permit-granting process in electronic form.

    Amendment

    4. Project promoters shall be allowed and enabled to submit any documents relevant to the permit-granting process in electronic form via a secure, interoperable portal. Member States shall ensure the digital exchange of documentation between the national authority, the single point of contact and the project promoters.

  36. Amendment 36Proposal for a regulation · Article 2 – paragraph 4 a (new)
    Amendment

    4a. Where an interoperable online portal is not available at the moment of application of this Article, the single point of contact shall provide for an alternative submission channel without delaying the time limits under Article 5 and shall notify the Commission of a time-bound plan that should not exceed 6 months to achieve full e-processing capability. That alternative submission channel shall be one-stop physical or postal. Capacity-building for implementing this paragraph may be supported under Regulation (EU) 20XX/XXXX on the European Defence Industry Programme (EDIP) where applicable.

  37. Amendment 37Proposal for a regulation · Article 2 – paragraph 5
    Current text

    5. The competent authorities shall ensure that any relevant studies carried out, or permits or authorisations issued, for a given project are taken into account and that no duplicate studies, permits or authorisations are required, unless otherwise required under Union or national law.

    Amendment

    5. The competent authorities shall ensure that any relevant studies carried out, or permits or authorisations issued, for a given project are taken into account and that no duplicate studies, permits or authorisations are required, unless otherwise required under Union or national law. The single point of contact shall ensure the coordination among the competent authorities and those authorities shall have access to all relevant documents to facilitate the fast-track procedure.

  38. Amendment 38Proposal for a regulation · Article 2 – paragraph 6
    Current text

    6. Member States shall ensure that the single point of contact and all competent authorities responsible for any step along the permit-granting processes, including all procedural steps, have enough qualified staff and sufficient financial, technical and technological resources necessary, including, where appropriate, for up- skilling and re-skilling, for the effective performance of their tasks under this Regulation.

    Amendment

    6. Member States shall ensure that the single point of contact and all competent authorities responsible for any step along the permit-granting processes, including all procedural steps, have enough qualified staff and sufficient financial, technical and digital resources necessary, including, where appropriate, for up- skilling and re-skilling, for the effective performance of their tasks under this Regulation.

  39. Amendment 39Proposal for a regulation · Article 2 – paragraph 7
    Current text

    7. The authorities involved in the permit-granting process and other authorities concerned shall specify and make available to the single point of contact concerned, the requirements and all information requested of a project promoter before the permit-granting process commences.

    Amendment

    7. The authorities involved in the permit-granting process and other authorities concerned shall specify and make available to the single point of contact concerned, the requirements and all information requested of a project promoter before the permit-granting process commences. Single points of contact shall also make available relevant and necessary documents of the project promoter to the authorities, where necessary in the permit-granting process.

  40. Amendment 40Proposal for a regulation · Article 2 – paragraph 8
    Current text

    8. Upon request by a Member State, the Commission may assist the authorities of that Member State with capacity building in support of implementation of this Regulation, notably in establishing or operating a single point of contact.

    Amendment

    8. Upon request by a Member State, the Commission shall assist the authorities of that Member State with capacity building in support of implementation of this Regulation, notably in establishing or operating a single point of contact. The Commission shall treat that request as a priority and commence implementation without undue delay in cooperation with the requesting Member State. Such assistance may include targeted technical and financial support, such as through Regulation (EU) 20XX/XXXX on the European Defence Industry Programme and cohesion policy instruments, to help Member States with limited administrative capacity.

  41. Amendment 41Proposal for a regulation · Article 2 – paragraph 8 a (new)
    Amendment

    8a. In Member States with a federal or otherwise decentralised administrative structure, the obligation to establish a single point of contact shall be understood as ensuring a coordinated and streamlined interface for each defence readiness project. Member States may designate more than one competent authority as single point of contact, where this is necessary to reflect their administrative organisation, provided that effective coordination mechanisms are established and that project promoters have one clearly identified coordinating authority acting as the sole interface for each project.

  42. Amendment 42Proposal for a regulation · Article 2 – paragraph 8 b (new)
    Amendment

    8b. Where a defence readiness project is cross-border within the EU, prompt notification and coordination by the single point of contact with the single points of contact of other Member States concerned shall be ensured. Member States shall ensure that single points of contact have protocols for the timely exchange and referral of information in such cases, without prejudice to national security and confidentiality rules

  43. Amendment 43Proposal for a regulation · Article 2 – paragraph 8 c (new)
    Amendment

    8c. The Commission, in cooperation with Member States, shall ensure the development of common indicators and methodologies to assess the performance of the single points of contact, based on the data reported annually pursuant to Article 8a. Member States shall ensure that the single points of contact collect, process and transmit relevant information in a consistent and timely manner, to contribute to the transparent and comparable monitoring of the implementation of this Regulation across the Union.

  44. Amendment 44Proposal for a regulation · Article 3 – paragraph 1 – introductory part
    Current text

    Member States shall provide public access to the following information on permit-granting processes relevant to defence readiness projects, online and in a centralised and easily accessible manner:

    Amendment

    Member States shall provide public access to the following information on permit-granting processes relevant to defence readiness projects, online and in a centralised and easily accessible manner, to the extent that such publication is without prejudice to national security and with due regard to confidentiality requirements:

  45. Amendment 45Proposal for a regulation · Article 3 – paragraph 1 – point d
    Current text

    (d) funding possibilities at Union or Member State level;

    Amendment

    (d) funding possibilities at Union and Member State level;

  46. Amendment 46Proposal for a regulation · Article 3 – paragraph 1 – point e a (new)
    Amendment

    (ea) guidelines and templates provided by the Member States for standardised permit applications where available;

  47. Amendment 47Proposal for a regulation · Article 3 – paragraph 1 – point e b (new)
    Amendment

    (eb) applicable environmental, health and safety laws.

  48. Amendment 48Proposal for a regulation · Article 4 – paragraph 1 – introductory part
    Current text

    Member States shall provide administrative support for defence readiness projects located on their territory, paying particular attention to SMEs and mid-caps, including small mid-cap enterprises, involved in those projects, including by providing:

    Amendment

    Member States shall provide administrative support for defence readiness projects located on their territory to all project promoters, regardless of the Member States in which they are established, paying particular attention to SMEs and mid-caps, including small mid-cap enterprises, involved in those projects, including by providing:

  49. Amendment 49Proposal for a regulation · Article 4 – paragraph 1 – point a
    Current text

    (a) assistance regarding compliance with applicable administrative and reporting obligations;

    Amendment

    (a) assistance regarding compliance with applicable administrative and reporting obligations, including with Union and national health, environmental, safety, social and labour laws;

  50. Amendment 50Proposal for a regulation · Article 4 – paragraph 1 – point c a (new)
    Amendment

    (ca) coordination and assistance to project promoters of defence readiness projects with cross-border dimension and coordination for core defence production assets;

  51. Amendment 51Proposal for a regulation · Article 4 – paragraph 1 – point c b (new)
    Amendment

    (cb) SME support mechanisms within the single point of contact, which include a dedicated SME desk providing tailored guidance and early advisory services to SMEs, mid-caps, and small mid-cap enterprises.

  52. Amendment 52Proposal for a regulation · Article 5 – paragraph 1
    Current text

    1. The permit-granting process for defence readiness projects, including the granting of the relevant permit, shall not exceed [60] days.

    Amendment

    1. The permit-granting process for defence readiness projects, including notification of the outcome of that process, shall not exceed 50 working days from the date of the acknowledgement of the completeness of the permit-granting application by the single point of contact.

  53. Amendment 53Proposal for a regulation · Article 5 – paragraph 1 a (new)
    Amendment

    1a. Where a defence readiness project involves a modification or extension of an existing facility already authorised under national law, the competent authority shall determine whether the modification requires a new or updated permit, or whether it may proceed under the existing authorisation, provided that environmental, health and safety standards are not affected.

  54. Amendment 54Proposal for a regulation · Article 5 – paragraph 2
    Current text

    2. Where a defence readiness project requires the construction of several facilities or units in one site, the project promoter and the single point of contact may agree on splitting the project into several smaller projects for the purposes of complying with the applicable time limits.

    Amendment

    2. In exceptional cases, and without prejudice to the ability of the competent authorities to fully and comprehensively assess compliance with Union or national law, where a defence readiness project requires the construction of several facilities or requires several phases, whether located on a single site or across multiple sites, the project promoter and the single point of contact may, where justified by the project’s technical or administrative characteristics, agree to process those components as separate sub-projects for the purposes of complying with the applicable time limits.

  55. Amendment 55Proposal for a regulation · Article 5 – paragraph 3
    Current text

    3. In exceptional cases, where the nature, complexity, location or size of the proposed defence readiness project so requires, a Member State may once extend the time limits referred to in paragraph 1 by a maximum of 30 days before their expiry and on a case-by-case basis.

    Amendment

    3. In exceptional cases, where the nature, location or size of the proposed defence readiness project so requires, a Member State may once extend the time limits referred to in paragraph 1 by a maximum of 25 working days before their expiry and on a case-by-case basis.

  56. Amendment 56Proposal for a regulation · Article 5 – paragraph 4
    Current text

    4. Where a Member State considers that the defence readiness project raises exceptional risks for the health and safety of workers or of the general population, and where additional time is necessary to establish that measures to address identifiable risks have been put in place, it may extend the time limits referred to in paragraph 1 by 60 days, within 30 days of the start of the permit-granting process.

    Amendment

    4. Where a Member State considers that there is evidence that the defence readiness project is of exceptional complexity, raises exceptional risks for the health and safety of workers or of the general population, raises an exceptional risk on the environment, or where a specific national security clearance is required, and where additional time is necessary to establish that measures to address identifiable risks have been put in place, it may extend the time limits referred to in paragraph 1 by 50 working days, within 25 working days of the start of the permit-granting process.

  57. Amendment 57Proposal for a regulation · Article 5 – paragraph 6
    Current text

    6. No later than 15 days from the receipt of the permit-granting application, the single point of contact concerned shall acknowledge that the application is complete and whether this Regulation applies or, if the project promoter has not sent all the information required to process the application, request the project promoter to submit a complete application without undue delay, specifying which information is missing. If the submitted application is deemed to be incomplete for a second time, the single point of contact may, within [15] days of the second submission, make a second request for information. The single point of contact shall not request information in areas not covered in the…

    Amendment

    6. No later than 12 working days from the receipt of the permit-granting application, the single point of contact concerned shall acknowledge that the application is complete and whether this Regulation applies or, if the project promoter has not sent all the information required to process the application, request the project promoter to submit a complete application without undue delay, specifying which information is missing. If the submitted application is deemed to be incomplete for a second time, the single point of contact may, within 12 working days of the second submission, make a second request for information. The single point of contact shall not request information in areas not…

    Excerpt — full text in the official PDF.
  58. Amendment 58Proposal for a regulation · Article 5 – paragraph 6 a (new)
    Amendment

    6a. The applicable time limit for the permit-granting process shall commence on the date of the acknowledgment of the completeness of the permit-granting application. Where an environmental impact assessment is required, the application shall be considered completed when the steps (i) and (ii) of the environmental impact assessment, according to the Directive 2011/92/EU, Article 1() points (g)(i) and (g)(ii), including the public consultation, if applicable, have been formally submitted and acknowledged as such in accordance with paragraph 6 of this Article.

  59. Amendment 59Proposal for a regulation · Article 5 – paragraph 8
    Current text

    8. Where the single point of contact does not inform the project promoter of the outcome of the permit-granting process within the time limit set out in paragraph 1 and extended, where applicable, in accordance with paragraphs 3 and 4, the permits covered by the application shall be deemed to be granted. The single point of contact shall promptly deliver written confirmation to the project promoter, indicating that the permits have been implicitly granted based on the application submitted.

    Amendment

    8. Where the single point of contact does not inform the project promoter of the outcome of the permit-granting process within the time limit set out in paragraph 1 and extended, where applicable, in accordance with paragraphs 3 and 4, the permits covered by the application shall be deemed to be granted, unless the principle of administrative tacit approval has been excluded for these types of procedures by the national legal system of the Member state concerned. The single point of contact shall within 10 days, without undue delay but not later than within 3 working days provide written confirmation to the project promoter, in writing or electronically indicating that the permits have been…

    Excerpt — full text in the official PDF.
  60. Amendment 60Proposal for a regulation · Article 6 – paragraph 1
    Current text

    1. National, regional and local authorities responsible for preparing plans, including zoning, spatial plans and land use plans, shall include in such plans, where appropriate, provisions for the development of defence readiness activities, projects as well as the necessary infrastructure. To facilitate the development of defence readiness projects, Member States shall ensure that all relevant spatial planning data is available online in accordance with Article 3.

    Amendment

    1. National, regional and local authorities responsible for preparing plans, including zoning, spatial plans and land use plans, shall include in such plans, where appropriate, provisions for the development of defence readiness activities, projects and their required infrastructure, and shall also take into account security considerations, including protection against cyber and hybrid threats targeting critical defence infrastructure. To facilitate the development of defence readiness projects, Member States shall ensure that non-confidential relevant spatial planning data is available online in accordance with Article 3 as well as with applicable Union and national law.

  61. Amendment 61Proposal for a regulation · Article 6 – paragraph 2 a (new)
    Amendment

    2a. Where a defence-readiness project is not covered by the plans referred to in paragraph 1, any environmental assessments required under Union or national law, including, where applicable, project-level assessments, shall be completed and taken into account prior to the final decision on the permit.

  62. Amendment 62Proposal for a regulation · Article 7 – paragraph 1
    Current text

    All dispute resolution procedures, litigation, appeals and judicial remedies as well as all administrative proceedings related to defence readiness projects before any national courts, tribunals, bodies or panels, including with regard to mediation or arbitration, where they exist in national law, shall be treated as urgent if and to the extent to which national law concerning relevant permit-granting processes provides for such urgency procedures and provided that the applicable rights of defence of individuals or of local communities are respected. Project promoters of defence readiness projects shall participate in such urgency procedures, where applicable.

    Amendment

    All dispute resolution procedures, litigation, appeals and judicial remedies as well as all administrative proceedings related to defence readiness projects before any national courts, tribunals, bodies or panels, including with regard to mediation or arbitration, where they exist in national law, shall be treated as urgent if and to the extent to which national law concerning relevant permit-granting processes provides for such urgency procedures and provided that the applicable rights of defence of individuals or of local communities are respected. Project promoters of defence readiness projects shall participate in such urgency procedures, where applicable. The competent authorities shall…

    Excerpt — full text in the official PDF.
  63. Amendment 63Proposal for a regulation · Article 8 a (new)
    Amendment

    Article 8a Monitoring and reporting 1. For the purposes of transparency, ex-post monitoring and Union-wide comparability, each Member State shall submit to the Commission, annually, a statistical report on the application of this Regulation, including: (a) the total number of received applications for permits for defence readiness projects; (b) the total number of fast-track procedure permits granted; (c) the total number of fast-track procedure permits granted tacitly, pursuant to Article 5(8); (d) the number of SMEs benefiting from fast-track procedures; (f) specific measures adopted to support SMEs and mid-caps; 2. The Commission shall make the aggregated results publicly available and, w…

    Excerpt — full text in the official PDF.
  64. Amendment 64The LeftProposal for a regulation

    Replaces or inserts a longer passage — full text in the official document.

  65. Amendment 65SEDE, IMCOProposal for a regulation

    Replaces or inserts a longer passage — full text in the official document.

Statistical baseline — not a forecast

How groups usually vote on similar files

Based on 149 past main roll-call votes on ENVI-responsible procedures, Jul 2019 → 2026-10-06.

If every group voted at its historical rate, with today’s seats: ≈72% of expressed votes in favour.

Seat-weighted baseline over 711 of 711 seats · how often this method is right →

EPPusually FOR85% FOR over 24,078 votes
S&Dusually FOR92% FOR over 18,973 votes
Renewusually FOR90% FOR over 13,153 votes
Greens/EFAusually FOR88% FOR over 9,354 votes
ECRusually AGAINST40% FOR over 9,260 votes
The Leftusually FOR76% FOR over 5,254 votes
Patriotsusually AGAINST31% FOR over 2,332 votes
IDusually AGAINST27% FOR over 6,700 votes
ESNusually AGAINST38% FOR over 762 votes
Non-attachedusually FOR60% FOR over 5,034 votes

Statistical baseline from past roll-call votes; not a forecast. · roll-call votes only

Follow this procedure — subscribe to its votes (RSS)

Official amendment documents

Full record

Members who amended this procedure

64 Members · by amendment count
1
Reinier VAN LANSCHOT
Reinier VAN LANSCHOT
Greens / EFA · 🇳🇱 Netherlands
51(51 solo)
2
Mathilde ANDROUËT
Mathilde ANDROUËT
Patriots for Europe · 🇫🇷 France
36
3
Marie-Luce BRASIER-CLAIN
Marie-Luce BRASIER-CLAIN
Patriots for Europe · 🇫🇷 France
36
4
Ondřej KNOTEK
Ondřej KNOTEK
Patriots for Europe · 🇨🇿 Czechia
36
5
Mélanie DISDIER
Mélanie DISDIER
Patriots for Europe · 🇫🇷 France
36
6
Anne-Sophie FRIGOUT
Anne-Sophie FRIGOUT
Patriots for Europe · 🇫🇷 France
36
7
Lynn BOYLAN
Lynn BOYLAN
The Left (GUE/NGL) · 🇮🇪 Ireland
36(36 solo)
8
Kosma ZŁOTOWSKI
Kosma ZŁOTOWSKI
European Conservatives & Reformists · 🇵🇱 Poland
32
9
Vasile DÎNCU
Vasile DÎNCU
Socialists & Democrats · 🇷🇴 Romania
30(5 solo)
10
Michał DWORCZYK
Michał DWORCZYK
European Conservatives & Reformists · 🇵🇱 Poland
30
11
Piotr MÜLLER
Piotr MÜLLER
European Conservatives & Reformists · 🇵🇱 Poland
30
12
Reinis POZŅAKS
Reinis POZŅAKS
European Conservatives & Reformists · 🇱🇻 Latvia
30
13
Kristian VIGENIN
Kristian VIGENIN
Socialists & Democrats · 🇧🇬 Bulgaria
25
14
Idoia MENDIA
Idoia MENDIA
Socialists & Democrats · 🇪🇸 Spain
25
15
José CEPEDA
José CEPEDA
Socialists & Democrats · 🇪🇸 Spain
25
16
Elio DI RUPO
Elio DI RUPO
Socialists & Democrats · 🇧🇪 Belgium
25
17
Lucia YAR
Lucia YAR
Renew Europe · 🇸🇰 Slovakia
25
18
Henrik DAHL
Henrik DAHL
European People's Party (EPP) · 🇩🇰 Denmark
25
19
Viktória FERENC
Viktória FERENC
Patriots for Europe · 🇭🇺 Hungary
22
20
Aurelijus VERYGA
Aurelijus VERYGA
European Conservatives & Reformists · 🇱🇹 Lithuania
13(10 solo)
21
Anna STÜRGKH
Anna STÜRGKH
Renew Europe · 🇦🇹 Austria
13
22
Engin EROGLU
Engin EROGLU
Renew Europe · 🇩🇪 Germany
13(9 solo)
23
Svenja HAHN
Svenja HAHN
Renew Europe · 🇩🇪 Germany
13
24
Sara MATTHIEU
Sara MATTHIEU
Greens / EFA · 🇧🇪 Belgium
12(12 solo)
25
Tomáš ZDECHOVSKÝ
Tomáš ZDECHOVSKÝ
European People's Party (EPP) · 🇨🇿 Czechia
12(12 solo)

The amendments, in full text

357 amendments

Every amendment as tabled — original text, proposed change and justification, with a link to the official PDF.

The full amendment texts load as you scroll here.
Report a data issue